The start was 5 Aug 2000 with the pouring of the foundation. The hose
got laid out, the cement was pumped, the foundation bolts were put
in (pictures 4 & 5), then it was tamped and finished. The cement team
consisted of pumper Chris _____ and cement carrier Johnny Arenas.