House Addition July 2002
Up Up Up

First two pictures shows how they "manlifted" the sheets of wood "up" to the second level. No specific projects this month, just pluggin' away on several things. Vent pipes now go "up", the gable ends are going "up", some big beams are "up". One of the really heavy beams is now bolted to the end of the overhang. And how about that chain hoisting system?!

020714a.jpg (59,571 bytes) 020714b.jpg (46,008 bytes) 020714c.jpg (25,540 bytes) 020717a.jpg (43,940 bytes)
020717b.jpg (51,566 bytes) 020717c.jpg (52,415 bytes) 020717d.jpg (49,004 bytes) 020717e.jpg (59,566 bytes)
020717f.jpg (57,953 bytes) 020717g.jpg (52,579 bytes) 020717h.jpg (44,307 bytes) 020717i.jpg (45,132 bytes)
020725b.jpg (46,953 bytes) 020724b.jpg (22,374 bytes) 020725a.jpg (43,775 bytes) 020724a.jpg (56,829 bytes)
020801a.jpg (86,648 bytes) 020801b.jpg (81,003 bytes) 020801c.jpg (42,281 bytes) 020801d.jpg (61,638 bytes)
020801e.jpg (54,995 bytes) 020801f.jpg (48,941 bytes) 020801g.jpg (57,315 bytes) 020801h.jpg (76,849 bytes)
020801i.jpg (173,407 bytes) 020801j.jpg (88,724 bytes) 020801k.jpg (119,459 bytes)