House
Addition 19 May 2002
Ceiling Joists Part Two
The load that got left "topside" was spread out today. The helpers
got a routine that worked quite well - using the ridge beam to help with
the weight. The joists are now spread out along the tops of the walls, waiting
for nailing into position. Barely got them distributed before dark, and
then they spent time covering with plastic - and beat the rain that came
that night. We had one leak, but fortunatly not in the newly painted kitchen.
Thanks to the two Richards and Sam who helped today.
|
|
|
|
|
|
|
|
|
|